Senior Principal Engineer · Project Manager · PhD, PE
Shahrouz Ghadimi.
El Paso, Texas
$540M
largest plant expansion I designed
96 mgd
of wastewater on my live dashboards
PhD · PE
desalination research, Texas license
This site is everything I work on: my technical work in water and wastewater treatment, and the side projects I build after hours. Go through any of them, take what is useful for free, build it yourself, and keep in touch.
Water work tap one for the full story
PhD in Civil Engineering, UT El Paso, 2020 (electrodialysis for brackish water desalination). Texas PE No. 151082 (Civil). Published in Environmental Science & Technology.
AI, with a human in charge
I build with AI every day, and I am one of its critics. It makes the work faster. Experience and a person who answers for the result decide whether the work is right.
👋I would love to hear from you. A water problem, an idea you want built, a question about something here, or just hello. Pick one and I will start the note for you.
El Paso Water is planning a new surface water treatment plant on the northwest side of the city to treat Rio Grande water and add drinking-water capacity. The utility asked engineering firms to compete for the work, and our team won it.
What I did
Led our team's winning pursuit: who is on the team, the technical approach and the proposal itself.
Ran a bench-scale treatability study on Rio Grande water, jar testing for coagulation and ozone demand and decay, so the approach rests on the real river and not on assumptions.
Checked the system's current treatment capacity and laid out capacity scenarios for the new plant.
Built an interactive site that introduces the team and how it would work with the utility.
My role
Project manager for the plant. Before that, proposal pursuit lead.
El Paso Water · El Paso, Texas
Bustamante WWTP expansion
39 → 52
mgd capacity
$540M
in construction
100%
design phase I directed
The project
The Roberto Bustamante Wastewater Treatment Plant is one of El Paso Water's largest plants. The expansion takes it from 39 to 52 million gallons a day, about $540 million in construction, and includes new digesters, solids handling and odor control.
What I did
Directed the 100% design of the solids side: digesters, solids handling and odor control.
Led pilot testing, wrote the equipment specifications and worked through details with the manufacturers and the other design disciplines.
Presented each design milestone to the client in workshops.
Now on site supporting the work through construction.
My role
Project manager and design engineer for solids and odor control.
Colorado River MWD · Big Spring, Texas
Big Spring direct potable reuse
1st
direct potable reuse plant in the US
6 years
of water quality data
3
data sources pulled together
The project
The district's plant in Big Spring was the first direct potable reuse facility in the United States: treated wastewater passes through microfiltration, reverse osmosis and UV advanced oxidation and goes into the drinking water supply. Swings in the quality of its wastewater feed limit how the plant can run, so the district asked whether Lake E.V. Spence, a reservoir already in its system, could serve as a supplemental or alternative feed.
What I did
Pulled together six years of water quality records from the district, TCEQ and USGS and built a seasonal range for what matters to the membranes: turbidity, dissolved solids, chloride, sulfate, alkalinity, organic carbon and temperature.
Showed the lake is lower in dissolved solids, chloride and sulfate than the current feed, with turbidity a conventional pretreatment step can handle.
Brought TCEQ in early to agree on a targeted sampling plan and a practical path to approval, treating the lake as an established regional source.
My role
Project manager.
Grand Strand Water and Sewer Authority and Santee Cooper · South Carolina
PFAS plans and membrane studies
40–60
mgd plant size
2
utilities
NF + RO
options compared
The project
Federal limits set in 2024 allow only a few parts per trillion of the most common PFAS in drinking water. Two South Carolina utilities needed to know what meeting them would take at their drinking water plants.
What I did
Evaluated nanofiltration and reverse osmosis options for plants of 40 to 60 million gallons a day as part of the utilities' PFAS planning.
Related work: built a national PFAS map from EPA's UCMR 3 monitoring data, with filters by contaminant, to help sort out where treatment is needed first.
My role
Membrane treatment evaluations.
El Paso Water · El Paso, Texas
Plant dashboards
96
mgd across every plant
3 wk → 2 d
per data request
The project
El Paso Water runs several wastewater plants with a combined 96 million gallons a day of capacity. Answering a question about plant performance meant pulling records by hand, and a single data request could take about three weeks.
What I did
Led the development of one dashboard system, built in Power BI, covering every El Paso Water wastewater plant.
It combines monthly analysis with real-time metrics, so staff can watch operations, tune processes and troubleshoot quickly.
Data requests went from about three weeks to two days, and the same dashboards now feed planning for future needs.
My role
Project manager.
El Paso Water · El Paso, Texas
Hickerson WRF recovery
5
months out of service
0
violations on restart
The project
A force main break took the Hickerson Water Reclamation Facility out of service for five months. A biological plant cannot just be switched back on: the bacteria that do the treatment have to be rebuilt while the plant still meets its permit.
What I did
Ran bench-scale tests (COD, TSS, oxygen uptake rate and ammonia) to track how the biology was coming back.
Guided the plant staff step by step through the restart.
Coordinated the responses to TCEQ and EPA.
The plant restarted with no environmental violations.
Zoom out and the molecules become the Rio Grande and a treatment plant: my day job. A reverse-osmosis skid, a lot of data, and the tools I built for both.
The same method, for a small business. The work I take on for clients down the hill from the Franklins: an AI-run front office for a solo practice, and the skills and agents I build along the way.
The airport, on the flat desert east of the mountains, where El Paso's is. A travel hub for a two-day company event: who lands when, who can share a ride with whom, and whether the flight is on time. People arrive as names on a list and leave as colleagues.
A telescope by the fire, pointed at the centre of the Milky Way. These are the real stars over El Paso on a moonless July night. The animation here plays out one whole life in 30,000 points of light.
Straight up from the fire until it is one dot. That dot is where Earth sits in the Milky Way: about 26,700 light-years from the centre, on a small spur between the Sagittarius and Perseus arms. Then the whole galaxy.
Everything you just saw is free to take, because I want your ideas to be real too. Look around your day and fix what bothers you. If you have an idea you want built, or want to talk one through, write to me.